Shifts and staffing

The right headcount, on the right shift, within the law.

Builds each person's monthly shift schedule in 30-minute blocks and calculates how much staff you need of each contract type, at the lowest labor cost.

Shift planning

Assigns each person their shifts and breaks in compliance with Chilean labor law: maximum consecutive days, two Sundays off per month, contract hours and fair distribution of Sundays.

Staffing

Calculates how many people of each contract type each store needs to cover demand, at the lowest possible labor cost.

  • Coverage gaps
  • Labor cost
  • Contracted hours

+7%

in sales at stores with optimized shifts

-30%

in labor costs, with better demand coverage

Results measured in the retail consulting project where this model originated, now built into Cromax.

Malla de turnos mensual por colaborador, con horas por día

Let's pick the first decision to optimize, together.

A pilot with one of your decisions and your real data, and the first compared plan in weeks.

Book a Cromax demo

We evaluate together whether there is a real opportunity

Diagnostic questionnaire

You complete a short form about your process, systems and volumes to validate fit before meetings.

Business case analysis

We meet to understand the challenge, estimate the solution's potential value, and confirm whether a clear opportunity exists.

Tailored proposal

If there is a clear opportunity, we prepare a proposal with scope, timeline and pricing adapted to your operation.

Tell us about your operation

Fill out the form and we will get back to you by email to schedule a conversation.

We will reply by email to arrange a first conversation.