Cromax

Cromax · Decision intelligence

Your operation's most expensive decisions no longer live in a spreadsheet.

Cromax connects your data, validates it and runs mathematical optimization models that deliver ready-to-execute plans. Compare scenarios in minutes and go with the best one, not just the only one you had time to build.

Born and proven in fresh fruit with Garces Fruit, Ranco Cherries and Prize Superfruits.

Flujo de kilos de cada variedad, por planta, hacia los pedidos que atiende

Margin-moving decisions, made against the clock.

Shift

Which lot runs on which line, and for which order, is decided by hand every shift, while raw material arrives different from what was expected.

Week

The weekly schedule gets redone on Tuesday, once reality has already broken it, and nobody remembers why that line was opened.

Purchasing

How much to buy and from which supplier is decided using last year's average and a single run.

People

Shifts for hundreds of people are built on a Sunday night in Excel, checking labor law compliance by hand.

One way to decide, from the shift to the season.

  1. 1

    Data

    Comes in as it is: ERP, sorter, databases or spreadsheets.

  2. 2

    Parameters

    Your operation's capacities, compatibilities and priorities, no code required.

  3. 3

    Engine

    Exact mathematical optimization: complex problems, answers in minutes.

  4. 4

    Comparison

    Named versions, compared side by side on their KPIs.

  5. 5

    Decision

    The plan goes back to the ERP and spreadsheets the data came from.

What you decide feeds back as data for the next run.

"What if the fruit comes in smaller?" gets answered here, before it does.

Simple up front. Serious under the hood.

Built for planners, not analysts: load, run, compare, decide. Under the hood, an optimization engine and industrial-grade data controls.

No black box

Full traceability: what data came in, what ran and why the result is what it is.

Simple interface

Load, run, compare and decide from a single screen, without depending on an analyst.

Robust

Multi-plant, multi-company and multi-user. Every run is logged and reproducible.

Adaptable

Your specific rule, the variety that can't go to that market or the line that only takes one size, goes into the model, not onto a waiting list.

Centro de control de Cromax con la comparación de versiones de un plan

Integration without an IT project

Connect databases and data warehouses, or upload files. Every load is validated before it reaches production.

Validation you can understand

Every data issue is reported with the exact row, the cause and how to fix it. Bad data stops the run instead of producing a wrong plan.

Feasibility preview

Before optimizing, see how much demand you can meet with current data and why the rest is lost, rule by rule.

Scenarios and versions

Every run is a named version you can compare by KPIs, export or use as the baseline for the next one.

Control center

One screen per decision: pick the plant, load data, tune parameters, run, read the KPIs and export.

Your decisions rule

Enable, force, prioritize or block markets by lot, order or line. Your overrides survive the next data load.

Incremental replanning

Start from the plan already issued and plan only what's new, without redoing what's already underway.

Back into your systems

The chosen plan is written to your database or exported to Excel or CSV. No more re-keying.

Security by company, plant and role

Data isolated per company at the database level, with roles and access profiles by module and plant.

Three verticals. One way to decide.

Fresh fruit

The entire packing chain, from plant to shift.

Five chained modules: plant allocation feeds the weekly schedule, the schedule cascades down to each shift, the shift to each line's outlets and, at close, reconciliation aligns output with what the sorter measured.

  • Cherries
  • Blueberries
  • Stone fruit
  • Kiwi
  • Grapes
  • Avocados
  • Citrus
  • Apples
  • Pears
  1. 1

    Plant allocation

    Which fruit and which order goes to each plant?

    Allocates fruit and orders to plants over a two-week horizon, prioritizing by shipping date, completing order lines and keeping grower groups together.

    • Order kilos fulfilled
    • Complete order lines
    • Unassigned fruit
  2. 2

    Weekly planning

    Which lines should run each shift of the week?

    Decides which lines to open each shift and when to process each order, based on the harvest estimate and each line's real capacity.

    • Line-shifts opened
    • Planned boxes
    • Kilos fulfilled
  3. 3

    Shift planning

    Which lot goes to which line, in what order and for which order?

    Assigns lots to lines and boxes to orders for one or two shifts, respecting capacities, the packing matrix, lot age and market eligibility. Minimizes variety and kit changeovers.

    • Demand fulfilled
    • Line utilization
    • Unplaced kilos
  4. 4

    Outlet planning

    Which size does each outlet handle, and with which kit?

    For each line's lots, defines which size and color each outlet handles, when to change kits and the resulting line speed. It's the operator's run sheet.

    • Planned vs. shift hours
    • Kit changes
    • Idle outlets
  5. 5

    Process reconciliation

    How do you reconcile output with what the sorter measured?

    At the end of the shift, moves boxes between compatible processes so each process's export % and size curve match the sorter, while keeping the mass balance.

    • Processes reconciled
    • Deviation before and after
    • Boxes moved
Planificación semanal: kilos por línea y turno, y ocupación de cada línea por pedido
Planificación de turnos: flujo de lotes a la línea y a los pedidos

Market compliance built in

Phytosanitary and commercial requirements live inside the model: protocols for China, Korea and Vietnam, GGN, multi-residue, quarantine zones and lot-level conditions. A misspelled country won't switch off a rule.

-50%

in process reconciliation costs

-50%

in the cost of planning each shift

+1,000 h

freed up per year for the planning team

«We didn't just cut hundreds of hours of operational workload: we transformed the dynamics and mindset of our teams.»

Sebastián Araya · Deputy Planning Manager, Export Division, Garces Fruit

Coming modules

  • Harvest estimation
  • Size and quality curves
  • Grower bin management
  • Box packing
  • Container planning
Supply

What to buy, from whom and when. With cost and service level in plain sight.

Plan purchases for your entire catalog month by month. Cromax decides orders by supplier while respecting lot sizes, pallets and containers, target coverage and your sourcing rules, and lets you compare scenarios before committing a single dollar.

What the model considers

  • Two-level lot sizing: units, pallets and containers
  • One supplier per container and single-supplier rules
  • Target coverage in months of safety stock
  • Lost sales or backorders, depending on your business
  • No avoidable stockouts
  • Efficient frontier between service level and cost

What it delivers

  • Purchase orders by month and supplier, with lots, boxes, pallets and arrival date
  • Inventory plan by material and period
  • Where every box will go, before optimizing
  • Service level
  • Stockouts
  • Container fill
Plan por material: inventario por mes, quiebres, llegadas de compra y órdenes por proveedor

Plan by material: month-by-month closing inventory, stockouts and purchase arrivals, with each material's balance and orders.

Scenarios side by side

What if container prices go up?

Every question is a version compared against the baseline plan. In the demo, making containers more expensive leads the model to buy with 15 containers instead of 18 and fill them more, in exchange for a slightly lower service level. The trade-off is in plain sight, with numbers.

18 → 15
containers
71% → 84%
average fill
100% → 99.4%
service level
Comparación de cinco versiones del plan de compras por nivel de servicio, ocupación y contenedores

Version comparison: baseline plan, customers who wait, strict coverage and expensive container, by their KPIs. Figures from the demo environment.

Shifts and staffing

The right headcount, on the right shift, within the law.

Builds each person's monthly shift schedule in 30-minute blocks and calculates how much staff you need of each contract type, at the lowest labor cost.

Shift planning

Assigns each person their shifts and breaks in compliance with Chilean labor law: maximum consecutive days, two Sundays off per month, contract hours and fair distribution of Sundays.

Staffing

Calculates how many people of each contract type each store needs to cover demand, at the lowest possible labor cost.

  • Coverage gaps
  • Labor cost
  • Contracted hours

+7%

in sales at stores with optimized shifts

-30%

in labor costs, with better demand coverage

Malla de turnos mensual por colaborador, con horas por día

Your decision isn't on the list? We'll add it in weeks.

Cromax is a platform, not a set of closed modules. Data integration, validation, versioning, the control center and export are already built. For a new problem we only model your decision, so a new vertical arrives in weeks, not a year-long project.

Tell us your problem

What's already built

  • Data integration and validation
  • Scenarios, versions and KPI comparison
  • Control center and analytics
  • Export to your systems
  • Security by company, plant and role

Decisions we can model

  • Manufacturing production and sequencing
  • Routing and dispatch
  • Fleet and resource allocation
  • Inventory and distribution across warehouses
  • Blending and formulation
  • Staffing in service centers

Weeks, not a year-long project.

01

Your data, as it is

We connect to what you already have. We replace nothing, and the plan flows back into those same systems. No IT project.

02

Pilot with real data

One decision, one season of data. The first compared plan arrives in weeks.

03

Grow on the same foundation

Each new module builds on the data already loaded and the same way of working.

Typical sources we connect

ERP or management system

SAP, Softland or others: commercial programs, orders and shipments.

Plant system

Sorter (e.g. Unitec): lots, sizes, quality and production.

Databases

PostgreSQL and corporate data warehouses.

Spreadsheets

Excel and CSV, for whatever still lives outside your systems.

A serious optimization engine.

Exact

Mixed-integer programming: optimal plans or a known optimality gap, not rules of thumb.

Minutes

Answers in seconds or minutes, with run profiles by urgency: draft, production or exact.

100%

of runs reproducible: each one stores its input data, parameters and definition.

Live

Track the progress of every run and export, stage by stage, in real time.

Cromax FAQ

No. Cromax reads from your systems and writes the plan back to them. It doesn't replace anything you already use.

Let's pick the first decision to optimize, together.

A pilot with one of your decisions and your real data, and the first compared plan in weeks.

Book a Cromax demo

We evaluate together whether there is a real opportunity

Diagnostic questionnaire

You complete a short form about your process, systems and volumes to validate fit before meetings.

Business case analysis

We meet to understand the challenge, estimate the solution's potential value, and confirm whether a clear opportunity exists.

Tailored proposal

If there is a clear opportunity, we prepare a proposal with scope, timeline and pricing adapted to your operation.

Tell us about your operation

Fill out the form and we will get back to you by email to schedule a conversation.

We will reply by email to arrange a first conversation.